Infrastructure

How an order is made

  1. Drawing review

    Material, tolerances and price confirmed in writing.

  2. Raw material

    Bar and billet from approved mills, tested on arrival.

  3. Forging

    Hammers and presses from 0.5 to 3 tonnes.

  4. Machining

    CNC turning, VMC milling, drilling and grinding.

  5. Inspection

    First piece, in-process and final checks, all recorded.

  6. Dispatch

    Packed, labelled and shipped with full documents.

Machines

The main machines on our shop floor.

MachineMake and modelCapacityCount
Pneumatic forging hammer0.5 t, 1 t, 2 tForgings up to 60 kg3
Friction screw press300 tClosed die forgings2
CNC turning centreSwing 400 to 650 mmUp to Ø 600 mm18
Vertical machining centre4-axisTable 1,000 x 500 mm8
CNC sliding-head latheBar Ø 32 mmHydraulic adaptors and pins4
Radial drilling machine50 mmFlange PCD drilling4
Cylindrical grinder1,500 mm between centresShafts to 0.4 Ra3
Machines in all42
42,000 sq ftPlant area
650 kVAPower connection
2, plus night forgingShifts
1.2 lakh pcs/monthCapacity